Construction Safety and CDM compliance
CDM Project
The CDM Regulations were introduced (revised in 2007 and again 2015) with the aims of reducing the poor health and safety record in the construction industry. A key requirement of the Regulations is the effective & systematic management of Project specific health & safety risks; from the initial concept and design, throughout the construction phase, day-to-day use and maintenance, refurbishment, and eventual demolition of the completed or refurbished structure.
The CDM Regulations place specific duties on several legally defined duty holder roles, i.e. the CDM Client, Designers, Contractors, Principal Designers and Principal Contractors.
The complexity or value of the construction work is not itself any indicator of risk. It is important to apply a proper and proportionate consideration of risk to all and any commissioned construction work – not just the “big” Projects.
The CDM Regulations apply to ALL construction work.
Our Corporate CDM compliance documents comprise several Guidance documents and a Checklist as listed below. These documents apply to:
- Council Services directly involved with construction design and management or actual construction work
- Council Services requesting or commissioning construction works via Property and Building Services
- external agencies, designers, contractors and consultant appointments made by Fife Council for Construction Projects.
External Consultants and appointed duty holders requiring further information are requested to contact their nominated Project Aministrator or Tender Enquiry contact in the first instance.
Note that our Project Checklist OHS-C-016.F2 is mandatory for all Projects involving significant new, or alteration to existing,designs. This form is recommended as an ‘aide mémoire’ for all construction projects.
A short-code fifedirect web address for this page exists:
Those involved in construction design will find a wealth of useful free resources at the "Safety in Design" website:
http://www.safetyindesign.org.uk/design-guides
Related
Publications
- CDM2015 - Key Changes (opens in a new window)
- CDM2015 G1 General Guidance_OHS-C-16.G1 (opens in a new window)
- CDM2015 G10 The Health and Safety File_OHS-C-16.G10 (opens in a new window)
- CDM2015 G2 Designer Guide_OHS-C-16.G2 (opens in a new window)
- CDM2015 G3 Client Guide_OHS-C-16.G3 (opens in a new window)
- CDM2015 G4 Principal Designer Guide_OHS-C-16.G4 (opens in a new window)
- CDM2015 G7 Principal Contractor and Contractor Guide_OHS-C-16.G7 (opens in a new window)
- CDM2015 G8 Pre-Construction Information_OHS-C-16.G8 (opens in a new window)
- CDM2015 G9 Construction Phase Plan_OHS-C-16.G9 (opens in a new window)
- CDM2015 Preconstruction Information Pack OHS-C-16.F4 (opens in a new window)
- CDM2015 Project Checklist_OHS-C-16.F2 (opens in a new window)
- OHS-C-16.G5: Legionnaire's Disease:An Information Note for Designers and Specifiers (opens in a new window)
- OHS-C-16.G6 Floors and walking Surfaces An Information Note for Designers and Specifiers (opens in a new window)
Tel: 03451 55 55 55 + Ext 45 67 38 Contact Health, Safety & Wellbeing online